← Back to Qualifications
Discretionary Grant Available · MQARolling

Mining Qualifications Authority · MQA

Section 13 apprenticeships and OHS learnerships.

Window:
Rolling grant applications
Priority focus:
Rock-breaker · Mine Health & Safety · Assay
M74

SAQA Qualification · 99512

QCTO Compliant

Mineral Beneficiation Process Controller (Mineral Processor Calcining)

Credits
100
NQF
NQF Level 4
Seta
MQA

R55 000

(Once-off Institutional License Fee)

Professional Role & Capability Blueprint


Target Designation
Certified Mineral Beneficiation Process Controller (Mineral Processor Calcining) Practitioner
Competency Focus
Master specialised practical applications, safety criteria, and regulatory mandates required of a qualified Mineral Beneficiation Process Controller (Mineral Processor Calcining).
Academic Weight
Full national recognition at NQF Level 4 yielding 100 credits upon successful PoE verification.

Strategic Institutional Purpose


Audit Objective
Formulated to systematically bridge operational skills deficits under the governing MQA quality matrix.
Value Proposition
Equips your workforce with measurable, legally compliant skills to optimise productivity, satisfy Workplace Skills Plans (WSP), and unlock maximum B-BBEE scorecard weight.

Who is this for


The Mineral Beneficiation Process Controller (Mineral Processor Calcining) is intended for individuals with some work experience or prior learning who wish to formalise their skills and advance their careers. If you have a passion for this field and want to turn that passion into a profession, this programme will give you the tools and credentials to succeed. It is also suitable for employers who wish to upskill their workforce to meet industry standards.

Qualification Rules · Module Matrix


Official SAQA module breakdown parsed from the qualification's registered rules.

Knowledge Modules (KM)

24 cr

Theory · 2 modules

  • 313912005-KM-0114 cr

    Plant Management

    NQF Level 4

  • 313912005-KM-0210 cr

    Calcining

    NQF Level 4

Practical Skill Modules (PM)

28 cr

Applied · 2 modules

  • 313912005-PM-0116 cr

    Monitoring and controlling the pre-and post-calcining processes

    NQF Level 4

  • 313912005-PM-0212 cr

    Monitoring and controlling the kiln processes

    NQF Level 4

Work Experience Modules (WM)

0 cr

Site · 0 modules

No modules listed in SAQA rules.

Total Credits (SAQA)52

Official SAQA Curriculum


Source of truth · SAQA ID 99512 · Field 06 - Manufacturing, Engineering and Technology › Fabrication and Extraction

Min Credits
100
Registered
2018-07-01
Re-registration
2023-06-30
Purpose

The purpose of this qualification is to prepare a learner to operate as a Mineral Processor: Calcining. A Mineral Processor: Calcining typically monitors and controls the processes for decomposition of carbonate materials, decomposition of hydrated minerals or heat treatment to effect phase transformations, as in conversion of anatase to rutile. A qualified learner will be able to monitor and control the calcining processes.

Rationale

This qualification is constructed according to the needs expressed by industry and it will provide portability and career opportunities for Process Controllers working in a number of strategically important mining sectors. This qualification will cater for the provisioning of the required skills to support the infrastructure development in the country as cement is a strategic commodity that underpins economic development in South Africa. A significant number of Process Controllers are employed in this industry. Plant operator training and education plays a fundamental role in improving the energy efficiency of the cement manufacturing process and reducing carbon dioxide emissions. Learners who enter this qualification will be well versed in all the Occupational Health and Safety issues; they will have experience of working with process control equipment; and they will be exposed to the operating dynamics of material handling equipment.

Learning Assumed to be in Place & RPL

Recognition of Prior Learning (RPL): RPL for access to the external integrated summative assessment: Accredited providers and approved workplaces must apply the internal assessment criteria specified in the related Curriculum document to establish and confirm prior learning. Accredited providers and workplaces must confirm prior learning by issuing a Statement of Results or certifying a Work Experience Record. RPL for access to the qualification: Accredited providers and approved workplaces may recognise prior learning against the relevant entry requirements.

Exit Level Outcomes
  • Monitor and control Calcining mineral beneficiation processes.
  • Interpret sample results within a calcining process.
  • Identify measuring and monitoring instrumentation on a calcining plant, read and interpret the information and take appropriate corrective action.
  • Identify and deal with potential up- and down-stream implications and problems within the calcining process.
  • Operate a calcining plant.
QCTO & MQA AlignedSAQA 99512

Qualification 99512 · Curriculum Architecture

Occupational Certificate: Mineral Beneficiation Process Controller (Mineral Processor Calcining) · NQF Level 4 (100 Credits)

Filter View
§ 01

Three Curriculum Pillars

24
Credits

Knowledge Modules

Classroom & E-Learning

KM-01 to KM-02 · 2 modules
  • Facilitated lectures & self-study
  • Written question banks
  • Formative comprehension checks
28
Credits

Practical Skill Modules

Simulated Line Tasks

PM-01 to PM-02 · 2 modules
  • Simulated line tasks
  • Observation rubrics
  • Structured task sheets
0
Credits

Work Experience Modules

On-the-Job Production

WM-01 to WM-00 · 0 modules
  • On-the-job rotation
  • Mentor logbooks
  • Workplace sign-offs
§ 02

Evidence & Audit Pipeline

Learner Portfolio of Evidence (PoE)
Owner · Candidate
1
Admin & Registration

ID, learner contract, induction pack, POPIA consent.

2
Knowledge Evidence

Written assessments & question banks — KM-01 to KM-07.

3
Practical Evidence

Task sheets, observation rubrics, assessor photos.

4
Workplace Evidence

Logbooks, mentor sign-offs, supervisor letters.

Assessor Master File
Owner · Registered Assessor
5
Assessment Reports

Judgements, learner feedback, remediation agreements, appeals log.

Internal Moderation & Quality File
Owner · Moderator / SDP
6
Moderation Evidence

10% sampling matrix, HACCP/LOTO compliance sheets, SDP sign-off.

§ 03

Final Accreditation Gateway

Step 1
Statement of Results

Issued by the accredited Skills Development Provider once internal moderation is signed off.

Step 2
EISA Readiness Declaration

Provider submits declaration + PoE to the Assessment Quality Partner (AQP).

Step 3
National Qualification Certificate

QCTO awards the SAQA-registered certificate on successful EISA outcome.

Learner Certified · Uploaded to National Learner Records Database (NLRD)

Learning Material Stack


Learner Guide
Facilitator Guide
Assessment Instruments
SETA Alignment Matrix

Start-to-Exit Moderation Timeline


  1. 1

    Pre-Delivery Setup

    Facilitator induction, learner enrolment forms, baseline assessment, PoE folder issue. Alignment matrix stamped.

  2. 2

    Delivery & Formative Moderation

    Modular rollout with formative assessments per KM/PM. Internal moderator reviews evidence weekly; feedback loop before summatives.

  3. 3

    Summative & External Moderation

    Summative assessments captured, PoE finalised, submitted for external moderation. Certification uploaded to the SETA/QCTO.

Bespoke QMS Build


We author your Quality Management System — policies, procedures, records, matrices — mapped to your accreditation scope. From R18,500.

Talk QMS on WhatsApp

Moderation Consultation


External moderation dry-run on your PoE + delivery pack. Written report with fixes before your real audit. From R4,900.

Book Moderation Session

Classroom Transformation Blueprint


4 Modules · 100 Credits · MQA

Broken Standard

  • 📄Photocopied guides with mismatched outcomes
  • Missing formative/summative assessments
  • ⚠️No SETA alignment matrix — audit fails
  • 🎲Facilitators improvise Mineral Beneficiation Process Controller (Mineral Processor Calcining) delivery
  • 🕳️PoE gaps flagged in moderation
i2Graduates Transform

i2Graduates Transformation

  • 2 KM + 2 PM + 0 WM modules mapped to NQF Level 4
  • Pre-validated assessment bank per module
  • MQA alignment matrix included
  • Facilitator scripts + learner activities per credit
  • PoE templates that survive external moderation

The i2Graduates Quality Guarantee


Every page of this bundle is meticulously checked for sequence and structural perfection — no missing pages, no stolen content, no shortcuts. You get pre-validated assessment instruments ready to survive rigorous compliance moderation, wrapped in an engaging curriculum your facilitators will love teaching.